Startup village, Antwerp (B).

Incubator at the Botanical Garden.

StartUp Village encompasses the renovation and conversion of a historic ‘hôtel de ville’ and a former school building into facilities for scale-ups. Both buildings are preserved for their heritage value. The lion’s share of the programme consists of office space and meeting rooms.

In the courtyard, where the historic Botanical Gardens are also located, the former school has been renovated with a minimum of resources and adapted to the new programme. The original room layout was decisive in this process. The existing stairwells have been complemented by the addition of a lift, sanitary facilities, kitchenettes and communal meeting rooms. All newly applied materials are in their colour, texture and detailing, a contemporary reference to their historic counterparts.

In the Town Hall, adjacent to the street, more significant interventions were necessary. The objective was to preserve the original layout and, where necessary, restore it, but also to enhance circulation, integrate modern technologies and improve firesafety. 

The first major intervention took place at the level of the former gate complex between the main building and the outbuilding. This space – which had been all but completely closed off over the centuries – was completely “cleaned up” and its original function as a communal passageway to the inner area and former school was restored. A light and elegant staircase has been integrated within the passageway, connecting the various levels of the main building and the outbuilding. The second major intervention concerns the restoration of the interiors of the main floor and all exterior façades. The main or “noble” floor retains its historic function as a reception and meeting space. The third intervention involves the virtually invisible integration of the ventilation equipment and other measures designed to improve acoustics and fire safety.

Read 
more
less
Details
Open
Close
Client
AG Vespa
Location
Lange Gasthuisstraat 29/31, Antwerp, (B).
Year
2007
 – 
2016
 – 
...
Size
3,000 m²
Status
Completed
Team
Bart Biermans
Hans Caarls
Amaury De Valensart
Tom Van Reybroeck
Awards
Publications
Photography
Visualisation
ROOA-1
mute
Dempen
Watch
Listen
This is some text inside of a div block.
2
7
No items found.
0:00
3:42
The triptych volumetric of the historic Hôtel de Ville have been restored.
The triptych volumetric of the historic Hôtel de Ville have been restored.
9
11

The design consists of freeing up the original rhythm of the volumes and reinterpreting historic parts of the building.

0:00
3:42
ROOA-2
mute
Dempen
Watch
Listen
This is some text inside of a div block.
7
10
No items found.
0:00
3:42
One of the two coach gates offers public access for slow-moving traffic between two shopping streets and the Botanical Gardens.
One of the two coach gates offers public access for slow-moving traffic between two shopping streets and the Botanical Gardens.
3
5
0:00
3:42
ROOA-3
mute
Dempen
Watch
Listen
This is some text inside of a div block.
6
8
No items found.
0:00
3:42
In this way, this gate was restored as a collective gateway to the inner area and the former school.
In this way, this gate was restored as a collective gateway to the inner area and the former school.
1
4
0:00
3:42
The close-built gate between the main building and the annex was completely 'unlocked' and restored to its former glory.
ROOA-4
mute
Dempen
Watch
Listen
This is some text inside of a div block.
3
6
No items found.
0:00
3:42
8
10

A light and elegant staircase has been integrated within the passageway, connecting the various levels of the mainbuilding and the annex.

0:00
3:42
ROOA-11
mute
Dempen
Watch
Listen
This is some text inside of a div block.
5
8
No items found.
0:00
3:42
The new staircase is a cantilevered, lightweight hanging structure so as not to add additional stress to the historic interior facades.
The new staircase is a cantilevered, lightweight hanging structure so as not to add additional stress to the historic interior facades.
10
12
0:00
3:42
Sketch made during the design process. Architecture and structure merge.
ROOA plans
mute
Dempen
Watch
Listen
This is some text inside of a div block.
3
7
plan ground floor
plan first floor
plan second floor
section through new stairs
section through Hôtel de Ville
No items found.
0:00
3:42
9
11
0:00
3:42
The new staircase has now been given a place in the city's public fabric.
ROOA-6
mute
Dempen
Watch
Listen
This is some text inside of a div block.
2
7
No items found.
0:00
3:42
When the interiors of the bel-étage were vacated, numerous historical ornaments and finishes came to light. These were meticulously restored, with respect for the passage of time.
When the interiors of the bel-étage were vacated, numerous historical ornaments and finishes came to light. These were meticulously restored, with respect for the passage of time.
9
11

At the Hôtel de Ville, the objective of the interventions was to preserve the original layout and, where necessary, restore it.

0:00
3:42
Rooa slider
mute
Dempen
Watch
Listen
This is some text inside of a div block.
3
5
No items found.
0:00
3:42
7
10
0:00
3:42
ROOA-8
mute
Dempen
Watch
Listen
This is some text inside of a div block.
1
6
No items found.
0:00
3:42
8
11

In the courtyard, where the historic Botanical Gardens are also located, the former school has been renovated with a minimum of resources and adapted to the new programme.

0:00
3:42
ROOA-10
mute
Dempen
Watch
Listen
This is some text inside of a div block.
6
8
No items found.
0:00
3:42
0:00
3:42
ROOA-9
mute
Dempen
Watch
Listen
This is some text inside of a div block.
3
6
No items found.
0:00
3:42
All newly applied materials are in their colour, texture and detailing, a contemporary reference to their historic counterparts.
All newly applied materials are in their colour, texture and detailing, a contemporary reference to their historic counterparts.
8
10
0:00
3:42